Update: 69Wayne Runs & Drives
2011-02-03 Guy: Engine Pulled Out
2011-02-02 Guy: Engine Pulled
2011-02-01 Guy: Engine Inspection
2011-01-31 Moz: Frame Break
2010_11_30 Moz: Alternator Wire Shelby
2011-01-28 Moz: Wheel Inspection
Did first inspection on front wheels; Found frame to be cracked both outside and inside; Discovered bumper shifted toward right had side to point it was damaging window paint; Four-finger space on left hand wheel between wheel and fender; Two-finger space on right hand front wheel to fender; Right hand wheel had shifter forward approximately 2 inches; Placed coupe on front jack stands; Removed both front wheels; Confirmed discovery; Removed both front fenders; Discussed with Big Chief the best approach for correction;
2010_07_09 MachLene: More Parts
April 16- MachLene’s Speaker Wiring Repairs
Here, we have the dash removed and the wiring pulled, so we re-did the wiring to the speakers in the back. The wiring as it was had been pinched in a few places and was poorly installed, so we laid it down and ran it in a much better way to prevent future malfunctions, so MachLene will be able to rock out to some great music!
April 9- Jolliff’s Wiring Repairs
Here are a few shots of the wiring repairs we’ve done. We worked through a lot of wiring shorts and replaced some bad segments of wires with repairs, in addition to fixing the problem with the ignition switch. Tim has also worked out the pinches in the speaker wiring and now they sound a lot better. We’re also going through some of the wiring under the hood and checked the alternator out.