01.27.2011

12.27.2010

12.26.2010

12.26.2010

12.19.2010

Removed and checked radiator;  Note- radiator will need flushing and pressure checking;  Removed wheels;  Made Mustang ready for inspection;  Set up on 4 jack stands.  Hello my name is Boom Boom!

12.18.2010

Bubba:  Continued:  Pulled engine, drained fluids, removed parts off engine;  Inspected clutch, bell housing, various oil leaks;  Made engine ready for storage;  Cleaned up mess;

Continued inspection; Started pulling interior;  Filed parts;  Inspected floor pans;  Made ready for photographing; Removed engine parts;  Tagged and bagged;  Inspected and removed seat belts;

12.18.2010

We started the remove engine process.  Please note we removed the stock distributor– MSD was removed days before.  We could not get her to time.

12.18.2010

Continued to work on timing;  Still, no luck;  Note- will set aside timing problem, pull engine, send to engine builder and continue with full inspection;

« Previous PageNext Page »