June 22-July 02 Drivetrain Installation
The guys are getting down to the nitty gritty stuff. They worked on the rear end, gear box, and steering column.
The transmission also came in and will be installed soon. Here are the shipping photos.
They also started installing the new trunk divider. Some welding had to be done and the divider still needs to be carefully cut for a good fit before its installed.
May 26-May 30 Reinstallation
They are continuing to install parts new and old. The rear windshield opening needed to be sanded to remove any old glue before the windshield glass is put back in. Tim also installed the new radiator and put in the old for shipment. We also put in the Monte Carlo bar.
Shawn began disassembling the gear box. Some of the gears are stripped and that was causing a popping noise when turning the steering wheel. More on that to come!